Server and data centre moves · heavy machinery and equipment

Server and heavy equipment relocations planned in stages.

We reduce downtime.

We physically relocate servers, IT racks, machinery and industrial equipment in Bucharest and across Romania, within the working windows agreed together with the client’s technical team. For complex projects, the work can be split by equipment, zone or production cell, in order to limit downtime.

We answer enquiries on the same working day. The initial technical inspection is free and carries no contractual obligation.

Generali Insurance · EUR 50,000

4.7 / 5 · Google reviews

15+ years · experience

In-house teams · clear procedures

Equipment we move

From IT racks and technical equipment to industrial machinery or heavy instruments, each category is assessed separately and moved according to a dedicated plan.

Echipa MovingBox mutând servere și rack-uri IT cu ambalaje antistatice în București

Servers and IT racks

Servers, rack-mounted equipment and racks of up to 42U, packed with antistatic materials, labelled and inventoried before the physical relocation.

Relocare server room și datacenter complet de echipa MovingBox, rack-uri și cablaj catalogat

Server rooms and data centres

The physical relocation of racks, PDUs, UPS units, switches and identified cabling, after the shutdown and technical preparation carried out by the designated IT team.

Mutare utilaje industriale grele în hală de producție, echipa MovingBox cu echipament de lifting

Industrial machinery

Production lines, presses and hydraulic systems, relocated on the basis of confirmed weights, the handling route and the lifting plan.

Mutare mașini-unelte CNC și strunguri cu transpalet, echipa MovingBox în hală industrială

Machine tools

Lathes, milling machines and small to medium-sized CNC machines, with the dismantling of the components included in the quote, securing for transport and handling with the equipment established after the inspection.

Mutare seif greu cu Stair Climber 600 kg, echipa MovingBox pe scări

Heavy safes

For safes of up to 600 kg we can use a Stair Climber and dedicated trolleys, if the route allows it. For heavier loads, the solution is established after the technical inspection.

Mutare pianină cu pături de protecție și curele de ridicare, echipa MovingBox în apartament

Pianos and instruments

Grand pianos, upright pianos and heavy instruments, with protection for sensitive surfaces, handling adapted to the route and proper securing for transport.

Relocare echipament medical RMN și CT pe role grele în spital, echipa MovingBox

Medical equipment

The physical relocation of medical and laboratory equipment is carried out only after an assessment and in coordination with the specialist designated by the client or by the manufacturer.

Mutare transformator industrial și cuptor cu macarale și chingi de ridicare, echipa MovingBox

Furnaces, transformers and process vessels

Fixed industrial equipment, relocated on the basis of the technical documentation, the confirmed weight and a lifting plan adapted to the location.

MovingBox commitments for oversized moves

Insurance, a fixed price and contractual responsibilities, all confirmed before execution.

Transport for oversized equipment

We establish the handling solution, the securing method and the route according to the dimensions, the weight and the access conditions. Any permits and external equipment required are confirmed separately for each project.

Generali insurance

MovingBox holds a Generali legal liability policy, with a limit of up to €50,000 per move, under the terms of the policy. The equipment and the declared values are reviewed before quoting, in order to confirm the applicable conditions.

A MovingBox team trained in OHS and fire safety

The assigned personnel have up-to-date OHS and fire safety training, personal protective equipment and a project-specific briefing before the work begins.

How we plan a relocation to limit downtime

One process, six steps, zero improvisation. Every stage is validated before moving on to the next.

1

Technical inspection

We check the dimensions, the declared weights, the handling route, the access and any structural or operational constraints.

2

HSE plan

We prepare the risk assessment, the protective equipment, the handling method and the working procedure, based on the principles of ISO 45001.

3

Coordinated disconnection

Together with the client’s IT, maintenance or technical team, we inventory and label the equipment before disconnection.

4

Specialised handling

We use a Stair Climber, ProLift, an external lift, a pallet truck or any other equipment set out in the agreed execution plan.

5

Transport with controlled securing

The equipment is protected and secured using methods suited to its weight and configuration, along the route confirmed before the job.

6

Repositioning and handover

We position and reassemble the components included in the quote, then hand the equipment over to the designated technical team for reconnection and functional testing.

MovingBox equipment

The right equipment for every scenario

For each piece of equipment, we establish the appropriate handling solution according to the weight, the dimensions, the access and the route.

Stair Climber with a capacity of up to 600 kg

Electric equipment for the controlled movement of heavy items on stairs, with a capacity of up to 600 kg, used after checking the route and its compatibility with the item being moved.

ProLift and ShoulderDolly

Ergonomic lifting and handling systems for heavy or bulky items, used according to the weight and the route.

Stair trolleys

For safes, pianos and other compatible heavy items, after checking the staircase, the support points and the capacity of the equipment.

Pallet truck

For palletised goods, equipment on pallets and other loads suited to a pallet truck.

External lift of up to 33 m

A capacity of up to 400 kg, for buildings without a goods lift or with difficult staircase access.

Threshold ramps

For level differences, uneven surfaces or industrial thresholds, avoiding mechanical shocks.

Load securing equipment

Straps, chocks and other locking systems, chosen according to the weight, the shape and the securing points of the equipment.

Safety and compliance

For HSE, procurement and audit departments, we work with clear documentation and procedures adapted to the project.

OHS and fire safety training

The assigned personnel have up-to-date OHS and fire safety training. The documents required for access clearance can be provided in line with the applicable legal and contractual requirements.

HSE plan aligned with the principles of ISO 45001

MovingBox is in the process of ISO 45001 certification, and our internal procedures are developed on the basis of the principles of this standard.

Confidentiality agreement

A confidentiality agreement is available on request before any work involving proprietary equipment, critical infrastructure or sensitive data.

Handling documentation

A handling plan, a handover report and, where necessary, photographic documentation before and after the operation.

Who this is for

For the departments responsible for planning, operations, technical infrastructure and compliance with internal procedures.

Production

Plant Manager / Operations Manager

For the phased relocation of machinery and production lines, with shutdown windows coordinated with the maintenance and production teams.

IT

IT Manager / Data Centre Manager

For the physical move of servers, racks and network infrastructure, synchronised with the shutdown and restart managed by the IT team.

Facility

Facility Manager

For safes, heavy furniture and technical equipment that require access checks, protection of the premises and controlled handling.

HSE

HSE Director

For risk assessment, verification of access documents and approval of the working procedure before the work begins.

What our clients say

3 true stories. Press play to see them.

Alexandra Dinuț

Swan Equity

Mirela Mateescu, Manager

A46

Oana Bogdan

TBMG Cleaning

FAQ for technical decision-makers

Answers to the questions most frequently asked by IT, Facility, Operations and HSE managers before planning a relocation.

How much does it cost to move a server rack?

The cost depends on the weight, the configuration, the distance, the access, the execution window and the handling equipment required. After the technical inspection, we send a quote with a fixed price for the services and conditions confirmed.

The MovingBox project manager works directly with your IT, maintenance, operations or facility management team. The client manages the shutdown, the backups, the technical disconnection and the validation of the equipment. MovingBox manages the inventory, the labelling, the protection, the handling, the transport and the physical repositioning.

No. MovingBox moves equipment physically only after it has been shut down and confirmed by the IT team as ready for handling. Logical migration, replication, failover and restart remain the responsibility of the client’s technical team.

Yes. The MovingBox personnel assigned to the project have up-to-date OHS and fire safety training. The documents required for access can be provided to the HSE or facility department before the work begins, in line with the applicable requirements.

The condition of sensitive equipment is documented before and after the operation. Any incident is recorded and assessed on the basis of the inventory, the photographs, the reports, the contract and the terms of the applicable insurance policy.

The solution can only be confirmed after inspecting the route and checking the weight, the dimensions, the staircase and the support points. Using the Stair Climber or any other equipment is possible only within the established technical and safety limits.

The Generali legal liability policy may cover damage directly related to MovingBox’s activity, up to €50,000, under the terms of the policy. The equipment and its value must be declared before quoting. For higher values or special risks, the need for additional cover is assessed separately.

Yes, projects can be scheduled in the evening, at night or at the weekend, depending on team availability, the rules of the site and the agreed working window. The schedule and the sequence of stages are confirmed before execution.

How a production line is relocated with controlled interruptions

For complex lines, the project can be split by cell, functional zone or critical equipment. Together with the production and maintenance teams, we establish the sequence of shutdowns, the routes, the handling windows and the responsibilities of each party.

The Gantt plan shows which equipment is shut down, when it is moved and when it can be handed over for reinstallation and technical restart. Where the configuration allows it, part of the production can continue while the other zones are relocated in stages.

What equipment and protocols we use in industrial relocations

The handling solution is established after the technical inspection, on the basis of the weight, the dimensions, the route and the constraints on site. MovingBox can use ProLift, a Stair Climber of up to 600 kg and an external lift of up to 33 m, while cranes or other external equipment are coordinated through certified suppliers.

Before the work begins, we establish the risk assessment, the working method, the equipment required and the responsibilities. The shutdown, isolation and technical restart remain the responsibility of the specialists designated by the client, while MovingBox coordinates the physical handling and transport.

Request a technical inspection at your site

A MovingBox specialist checks the equipment, the handling route, the access and the operational constraints. Based on the inspection, you receive an execution proposal and a quote with a fixed price for the confirmed services.

    Captcha verification captcha

    Your data is safe with us. No spam. We’ll only call you to arrange your moving survey.