Office moves in Bucharest, with minimum impact on your business
MovingBox coordinates the relocation of headquarters and offices, with a dedicated project manager, an execution plan, an in-house team and clearly defined responsibilities, from the initial survey to the handover of the spaces at the new premises.
- Generali policy of up to €50,000, under the terms of the policy
- Gantt plan and dedicated project manager for corporate relocations
- Fixed contractual price for the services confirmed in writing
- In-house MovingBox team, trained and equipped for office moves
We answer survey requests on the same working day.
Generali Insurance · EUR 50,000
4.7 / 5 · Google reviews
15+ years · experience
In-house teams · clear procedures
Two company sizes, two relocation plans
From an office with 10-12 employees to a headquarters with 250 workstations, we plan every project according to the volume, the departments, the IT infrastructure, the furniture, the archive, the access and the company’s schedule.
SME · up to 49 employees
“We need a well-organised move, with a clear budget and work resumed as quickly as possible at the new premises.”
- A compact plan, adapted to the number of workstations and the real volume
- Execution during the week, in the evening or at the weekend, to reduce the impact on your business
- A quote with a fixed price for the confirmed services
Corporate · 50 employees or more
“We need a controlled relocation, with the equipment correctly positioned and clear reporting to management.”
- Dedicated project manager, Gantt plan and reporting at the agreed milestones
- Coordination with IT, HR, facility management, reception and security
- Phased relocation, outside working hours or by zone, to limit interruptions to your business
Three MovingBox standards for corporate relocations
A clear price, insurance and an in-house team, all agreed in writing before the first day of the move.
Fixed contractual price
The price stays fixed for the services, the volume and the conditions confirmed in writing. Any change to the project is discussed and approved before execution.
Generali insurance
MovingBox holds a Generali legal liability policy, with a limit of up to €50,000 per move, under the terms of the policy. Special items and high values must be declared before quoting.
An in-house team with clear procedures
The MovingBox team handles the services included in the quote, under the coordination of a designated project manager.
How we move your company, from A to Z
One process, six steps, zero improvisation.
Survey at your premises
We come to your offices, estimate the volume and check the access, the floor, the lift, the parking, the furniture, the archive, the IT equipment and the areas that need to be moved.
Plan and fixed-price quote
We draw up the relocation plan, the execution schedule and the contractual quote with a fixed price for the agreed services.
Labelling and packing
We organise your assets by department, user or zone and establish what MovingBox packs and what the client’s team prepares.
The move itself
The MovingBox team carries out the relocation according to the agreed plan, within the time slot agreed with you, with a project supervisor on site.
Furniture reassembly
We reassemble the furniture included in the quote and position the goods according to the confirmed plan.
Handover and check
We check the positioning of the goods, the services performed and any observations, which are recorded in the handover documents.
One PM. One plan. A relocation under control.
The MovingBox project manager coordinates the relocation from the survey to the handover. You receive a Gantt plan with stages, owners, deadlines and priorities, together with updates throughout execution.
- Gantt plan with tasks, owners and deadlines
- Coordination with IT, administration, HR and facility management
- A record of the stages, zones and teams in our internal CRM
- Final report with the services performed, the observations and the status of the handover
The final schedule is confirmed after the volume, the access and the included services have been assessed.
Relocations planned around your company’s schedule
We organise your office move so that your team can get back to work as quickly as possible at the new location. We plan by hour, department, zone or stage, depending on your company’s schedule and the complexity of the relocation.
During the week
The company move can be organised outside peak hours or by independent departments, so that day-to-day work can continue with minimal interruption.
In the evening
Execution after working hours, with the packing, transport, reassembly and positioning services confirmed in the quote.
Weekend
Relocation on Saturday or Sunday, so that the new premises can be ready for work to resume at the start of the week. No interruption to your business.
In stages
Relocation by department, zone or operational unit, for companies that need to keep working in parallel with the move.
Office space moves: services that can be included in the fixed-price quote
In the contractual quote you can clearly see which services are included, which materials we use and which equipment we allocate to your office move.
Professional packing
Boxes, bubble wrap, kraft paper, labels and organised sealing by department, office or work zone.
Dismantling and reassembly
The dismantling and reassembly of the furniture identified at the survey and included in the project.
IT equipment
Workstations, monitors, printers and peripherals packed, labelled and physically positioned according to the plan. Technical disconnection and reconnection are the responsibility of the designated IT team.
Safes and archives
Equipment for heavy items, physical archives, sensitive documents and materials that need to be handled in an organised way.
External lift
For buildings without a goods lift or with difficult staircase access, if the location allows the external lift to be installed.
Our own trucks
MovingBox vehicles prepared for corporate relocations, with our own team and clear coordination along the route.
Temporary storage
Storage between vacating the old premises and occupying the new location, quoted separately according to volume and duration.
Unpacking and positioning
Placement according to the plan, by department, office or zone, so that your team can get back to work as quickly as possible.
What clients say about the way we work
Real experiences of how MovingBox projects are organised, communicated and delivered.
Alexandra Dinuț
Owner - Swan Equity
Mirela Mateescu
A46
Oana Bogdan
Owner - TBMG Cleaning
MovingBox storage facilities for the transition period
When the new premises are not yet ready or the move is carried out in stages, we keep your company’s furniture, archives, equipment and boxes in secure facilities. You have flexible options.
6 m³
Crate / Liftvan
Suitable for a few boxes, equipment and items that need temporary storage between vacating the old premises and occupying the new ones.
16 m³
Individual storage unit
A space suited to a complete office, an archive, equipment or departmental furniture. Independent access is possible, depending on the location and the agreed terms.
33 m³
20’ container
A solution for medium-sized corporate relocations, office furniture, boxes, archives and equipment. Goods are inventoried and labelled.
67 m³
40’ container
Large capacity for corporate headquarters, phased projects, bulky furniture, extensive archives or medium and long-term storage.
Open space
Storage on shelves or pallets
An efficient solution for large volumes, pallets, inventoried goods, archives or assets that can be stored in an organised way in a shared space, with controlled access.
MovingBox facilities have 24/7 security, video surveillance, controlled access and insurance options in line with the active policies for the storage location.
Relocating a headquarters is an operational project involving furniture, IT equipment, archives, departments and firm deadlines — not just furniture transport. Every item has to be identified, transported and positioned according to the plan for the new space, so that work can resume as quickly as possible.
The process starts with a survey of the premises and continues with the Gantt plan, the assignment of responsibilities and the appointment of a MovingBox project manager. The stages are coordinated with the IT, HR, facility management, administrative and security teams, and with the suppliers involved.
The move can be scheduled during the week, in the evening, at the weekend or in stages, depending on the building rules and the company’s calendar. Every stage is documented and tracked through to the final handover.
MovingBox provides a clear, documented relocation process. Before the move we establish the services, the schedule, the team, the materials, the responsibilities and the fixed price for the agreed project.
Our in-house team is trained and equipped for packing, handling, transport, furniture reassembly, archive management and the physical positioning of IT equipment. Goods are protected by the Generali legal liability policy, with a limit of up to €50,000, under the terms of the policy.
Corporate projects are coordinated by a dedicated manager, on the basis of a Gantt plan, a labelling system and reporting at the agreed stages. MovingBox’s experience includes relocations for companies, embassies and international brands (Lidl, Mercedes-Benz, the British Embassy, Makita, Tuborg, Ogilvy, Sephora, Deichmann, Marvel, Untold).
The process starts with a free survey at your premises and continues with a quote at a fixed price for the confirmed services.
Frequently asked questions about headquarters and office relocations
Clarifications for B2B decision-makers on surveys, costs, planning, responsibilities and contractual terms.
How much does an office move cost and how do you set the price?
The price of a company move is set after a free survey of the volume, the furniture, the IT equipment, the archive, the heavy items and the spaces involved. We also assess the access at both locations, the lifts, the parking, the building rules and the time slot permitted for execution.
The cost depends on the size and complexity of the relocation, as well as on the services requested: packing, materials, labelling, dismantling and reassembly, transport, positioning or temporary storage.
After the survey, you receive a contractual quote with a fixed price for the confirmed services, setting out the team, the materials, the transport, the schedule, the responsibilities and the payment terms.
What does the insurance policy cover?
MovingBox holds a Generali legal liability policy, with a limit of up to €50,000, applicable to packing, handling, transport and storage services, under the terms of the policy. It may cover damage to the goods handled, as well as material damage caused accidentally in the working areas and along the access routes within buildings, including walls, doors and lifts. The policy may also cover liability towards third parties who suffer bodily injury as a result of an accident directly related to MovingBox’s activity.
IT equipment, safes, premium furniture, fragile items and high-value goods must be declared at the survey and included in the inventory. The cover depends on the services contracted and on the way the goods are packed and handled; goods packed by the client, or furniture dismantled by third parties, may fall outside the cover. The applicable terms, limits and exclusions are those set out in the active policy.
How long does an office move take and how do you minimise downtime?
The duration of an office move depends on the number of workstations, the volume of furniture, the IT equipment, the archive, the access and the rules of the two buildings. A small or medium-sized company can be relocated in a single day, while complex corporate projects may require several days or a phased execution.
To reduce downtime, MovingBox assigns a project manager, prepares the Gantt plan and coordinates the labelling, the order of the move and the positioning at destination with the departments involved.
The relocation can be scheduled during the week, in the evening, at the weekend or by zone. The final schedule is confirmed after the volume, the access and the requested services have been assessed.
How do you handle IT equipment, servers and connections?
IT equipment is inventoried, labelled and packed separately, using dedicated boxes and antistatic protective materials. The MovingBox project manager coordinates the operation with your IT department, so that each piece of equipment reaches the user and the position agreed.
MovingBox handles the packing, handling, transport and physical positioning. The shutdown, disconnection, configuration and restart of the infrastructure are carried out by the client’s IT team or by the designated supplier.
What do we sign: a contract or a quote by email?
For corporate relocations, we work on the basis of a written quote and a service agreement. The documents set out the services included, the fixed price, the schedule, the responsibilities, and the payment and insurance terms.
On request, the contract can be drawn up in a bilingual Romanian–English format and can include annexes for the inventory, the moving plan, access, confidentiality and contact persons.
Any change to the volume, the services, the date or the access conditions is discussed and confirmed in writing before execution.
How is payment handled for corporate clients?
For corporate clients, the payment terms are set out in the contract before the project begins. For one-off relocations, an advance may be requested to reserve the team, the date, the vehicles and the materials, with the balance paid according to the contractual term.
For framework agreements, phased projects or recurring partnerships, invoicing and payment terms are established by commercial agreement. The documents required for internal validation, such as the job report, the inventory or the handover report, are provided where these have been included in the quote.
We are a small company, under 20 employees. Is MovingBox worth it?
Yes. For SMEs, the plan is adapted to the number of workstations, the volume, the access and the company’s schedule, with no unnecessary steps. The relocation can include furniture, archives, IT equipment, packing, labelling, transport and reassembly, in line with the quote.
After the free survey at your premises, you receive a schedule and a quote with a fixed price for the confirmed services. The move can be scheduled during the week, in the evening or at the weekend, so that work resumes as quickly as possible.
Do you have ISO certifications or quality standards?
MovingBox works with documented procedures for surveying, quoting, packing, handling, transport, incident reporting and the coordination of B2B projects.
The company is in the process of certification for the ISO 9001, ISO 14001 and ISO 45001 standards. Until certification is complete, projects are managed through clear internal processes, a project manager, an execution plan, trained personnel and reporting at the agreed stages.
On request, we can provide the relevant documents for assessing MovingBox as a supplier, depending on the project and the stage of the certification process.
How far in advance should we plan the company move?
For a small or medium-sized office, we recommend starting the planning 2–4 weeks in advance. For complex corporate relocations, with several departments, IT equipment, controlled access or phased execution, the recommended period is 4–8 weeks.
This interval allows for the locations to be surveyed, the quote to be prepared, the resources to be reserved and the access, schedule and responsibilities to be coordinated. Availability and the final schedule are confirmed for each project.
What information do we need to send for an accurate quote?
For the quote we need the origin and destination locations, the number of workstations, the estimated volume of furniture, archives, IT equipment and any special items.
We also assess the access conditions, including the floors, the lifts, the parking, the distance to the truck, the permitted working hours and the building rules. The floor plan of the new premises, the inventory and the layout plan help us prepare a more accurate quote, with the services, resources, schedule and a fixed price for the confirmed volume.
Do you survey both locations?
Yes. For corporate relocations, the survey can be carried out both at the current premises and at the new location, especially if the project involves many workstations, modular furniture, IT equipment, archives or difficult access.
At the current premises we check what needs to be moved, what needs packing, which furniture is to be dismantled, which equipment is sensitive and how the loading can be done. At the new premises we check the access, the internal routes, the lifts, the unloading areas, the temporary storage spaces and how items are to be positioned according to the floor plan.
If one of the locations is not yet available, we can work on the basis of plans, photographs, information from the administrator and a video survey. For large projects, we recommend a physical check of both locations before the final schedule is confirmed.
Who should be involved internally in planning the move?
For an efficient corporate move, we recommend appointing a main contact person on the company’s side: an Office Manager, Facility Manager, Administrative Manager or a representative from Procurement.
Depending on the complexity of the project, representatives from IT, HR, finance, security, reception, administration, legal and management may also be involved. Each department has a different role: IT handles the technical disconnection and reconnection, HR communicates internally, the administrative team coordinates access and the building, and management approves the schedule and the budget.
MovingBox assigns a dedicated project manager for the relocation itself, but internal decisions need a clear owner within the company. This way, we avoid bottlenecks, delayed approvals and unconfirmed changes on moving day.
How do we prepare employees before the move?
For office relocations, internal communication is very important. We recommend that employees receive information well in advance about the moving date, what they need to pack themselves, what remains MovingBox’s responsibility, how items are labelled and where they will be working at the new premises.
A simple labelling system can be used for each workstation: the employee’s name, the department, the zone, the desk or an internal code. Boxes, chairs, monitors, PC units and accessories can be marked so that they reach the correct area at destination.
For larger projects, we can prepare short instructions for employees: what goes into the boxes, what does not, how boxes are sealed, how equipment is handed over and who the contact person is on the day of the relocation.
How do you make sure every desk, box and piece of equipment ends up in the right place?
We use labelling by department, user, room, zone or internal code, depending on the company’s structure and the layout of the new premises. The labelling system is agreed before the move, together with the designated contact person.
Boxes, furniture, chairs, IT equipment and important items can be marked individually, so that the MovingBox team knows where to position them at destination. For corporate projects, we can work with a floor plan, an inventory list, numbered zones or departmental codes.
At the new premises, the team unloads and positions everything according to the agreed plan. At the end, we carry out a check together with the contact person, and any observations are recorded in the job report.
How do you handle archives and confidential documents?
Archives and sensitive documents are treated separately from ordinary furniture. Before the move we establish the volume of the archive, the packing method, the level of confidentiality, the authorised persons and the transport order.
Documents can be packed in sealed boxes, labelled by department, year, category or internal code, without exposing the contents. On request, we can work with an inventory, sealing and handover to a designated person within the company.
For large archives, we recommend preparing in advance: removing documents that no longer need to be kept, separating active documents from historical ones and establishing the exact storage area at the new premises. This way, the archive does not become a bottleneck on moving day.
What happens to old or surplus furniture?
If the relocation leaves you with old furniture, surplus furniture, archives that are no longer used or equipment that should not be taken to the new premises, we can include a separate solution in the moving plan.
Depending on the condition of the items, they can be stored temporarily, moved to another location, prepared for sale, donation, recycling or disposal through specialised suppliers. MovingBox can handle the handling, transport and storage, and the final solution is agreed together with the client.
It is important that these decisions are taken before moving day. If old furniture is not separated in advance, it can needlessly take up space in the truck, on the team’s time and at the new premises.
What do we do if the new premises are not ready on the agreed date?
If the new premises are not ready, we can adapt the plan through temporary storage, a phased move or rescheduling, depending on the situation and availability.
MovingBox can collect the furniture, archives, equipment and boxes from the old premises, record them in an Inventory / Packing List and store them temporarily in MovingBox facilities, until the new location is ready.
This solution is useful when delays arise in relation to fit-out works, the handover of the space, installations, new furniture, access, internal approvals or the handover of the old premises. Storage is included separately in the quote, with a clear period, volume, access conditions and costs.
Can you move our company in stages or across several locations?
Yes. For companies that cannot stop work completely, the relocation can be organised in stages: by department, zone, site, floor, team or operational unit.
For example, we can first move the archive and the non-critical furniture, then the administrative departments, then the operational teams and, finally, the IT equipment or sensitive areas. For companies with several sites, the plan can include multiple collections and deliveries, with separate labelling and routes.
A phased move helps companies keep working in parallel with the relocation. For this type of project, the MovingBox project manager prepares the schedule, the order of work, the teams involved and the reporting for each stage.
Who handles building rules, lifts and access?
Building rules are essential in a corporate move. Before execution, we check together with the client or the building administrator: the permitted time slots for the move, truck access, the loading area, the availability of goods lifts, the protection required, the necessary documents and the security rules.
Office buildings may have special requirements: limited hours for moves, booking the goods lift, floor protection, access based on a named list, wearing a high-visibility vest and helmet, a health and safety briefing or prior notification to reception.
MovingBox can coordinate these operational details with the person designated by the client. The aim is for the team to enter the building at the agreed time, with approved access and without administrative delays.
Do you offer support after the move?
Yes. After the relocation, we can include post-move support for repositioning, adjustments, internal moves, additional furniture, moving boxes between departments or delivering goods left temporarily in storage.
In the first hours or days after the move, natural adjustments may come up: a desk needs repositioning, an archive needs to be moved to another room, a meeting room needs reconfiguring or certain boxes need to be redistributed. These services can be included in the quote or scheduled separately, depending on the project.
For large relocations, we recommend a final check together with the contact person: furniture positioning, the status of the boxes, observations, remaining items, special equipment and any additional work required.
A MovingBox specialist checks the volume, the access, the furniture, the equipment and your preferred schedule, then prepares the preliminary plan and the quote with a fixed price for the confirmed services.
- Generali policy of up to €50,000, under the terms of the policy
- Fixed contractual price for the confirmed services
- In-house MovingBox team, trained and equipped
- Project manager and Gantt plan for complex corporate relocations
Your data is used solely to assess your request and schedule the conversation, in accordance with the Privacy Policy.